Operational Highlights
In 2008, the ERCB was responsible for regulating
- 175 172 operated wells
- 797 gas plants
- 4613 compressor stations
- 14 764 gas batteries
- 412 555 kilometres of pipelines
Applications
- 43 775 applications were submitted to the ERCB
- 1.1 days was the average turnaround time for routine facility applications
Inspections
- 18 667 inspections were conducted
Hearings
- 20 hearings were held
Drilling
- 15 417 wells were drilled
Pipelines
- 9011 kilometres of pipelines were added